DISTURBANCE OF TRACK-BED AT JUNCTIONS WITH BRIDGES
STOERUNG DER GLEISLAGE BEIM UEBERGANG ZU KUNSTBAUWERKEN
Study of the causes of deterioration at gaps on the track between the ballast and the bridge. Possible solutions for construction and maintenance to ensure satisfactory continuity; case of bridges with long spans and ballastless track.
-
Corporate Authors:
Hestra Verlag
Holzhofallee 33, Postfach 4244
6100 Darmstadt 1, Germany -
Authors:
- EISENMANN, J
- LEYKAUF, G
- Publication Date: 1977-10
Language
- German
Media Info
- Features: Figures; Photos; References;
- Pagination: p. 673-683
-
Serial:
- Eisenbahntechnische Rundschau
- Volume: 26
- Issue Number: 10
- Publisher: Hestra Verlag
Subject/Index Terms
- TRT Terms: Ballastless track; Bridge decks; Deterioration; Maintenance of way; Railroad tracks
- Old TRIS Terms: Ballast deck bridges; Track deterioration
- Subject Areas: Maintenance and Preservation; Railroads;
Filing Info
- Accession Number: 00172004
- Record Type: Publication
- Source Agency: International Union of Railways
- Files: TRIS
- Created Date: Mar 14 1978 12:00AM