RAILWAY CONSTRUCTION AND OPERATION REQUIREMENTS. STRUCTURAL AND ELECTRICAL CLEARANCES. 3RD EDITION
The requirements specify the structural clearances that should be provided on new electrified railway lines and on existing lines where new structures are built. They are also to be provided where existing structures are modified or where clearances are otherwise altered. The requirements also deal with clearances between trains, intervals between lines, electrical clearances on electrified railway, and, lineside refuges.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/isbn/0115504435
-
Corporate Authors:
Her Majesty's Stationery Office
Atlantic Ho, Holborn Viaduct
London EC1P 1BN, England - Publication Date: 1977
Language
- English
Media Info
- Features: Figures;
- Pagination: 14 p.
-
Serial:
- Issue Number: 3
Subject/Index Terms
- TRT Terms: Car clearances (Railroads); Construction management; Design; Layout; Railroad electrification; Railroads; Safety; Specifications; Structures; Tunnels
- Uncontrolled Terms: Design criteria
- Geographic Terms: United Kingdom
- Old TRIS Terms: Clearances; Railway; Track spacing
- Subject Areas: Bridges and other structures; Construction; Design; Planning and Forecasting; Railroads; Safety and Human Factors; I21: Planning of Transport Infrastructure;
Filing Info
- Accession Number: 00176918
- Record Type: Publication
- Source Agency: Transport and Road Research Laboratory (TRRL)
- ISBN: 0 11 550443 5
- Report/Paper Numbers: Monograph
- Files: ITRD, TRIS
- Created Date: Jun 14 1978 12:00AM