PROCEEDINGS--WORKSHOP ON MATERIALS HANDLING FOR TUNNEL CONSTRUCTION
With the anticipated increases in tunnel construction in the next decade, greater demands will be made on transportation sytems to remove tunnel muck at rates consistent with tunnel excavation rates. This workshop discussed and noted that conventional materials-handling systems such as rail, rubber-tire vehicles, and conveyors will have to expand their capabilities. It was also stated that hybrid and lesser known systems such as pneumatic and slurry pipelines must be considered as potetial systems for muck haulage, since they show substantial promise for transporting the volumes projected for the next decade. /UMTA/
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/isbn/MA060025
-
Supplemental Notes:
- Sponsored by DOT, Urban Transportation Administration under contract to DOT, Transportation Systems Center.
-
Corporate Authors:
Colorado School of Mines
Division of Engineering, 1500 Illinois Street
Golden, CO United States 80401 -
Authors:
- Faddick, R R
- Martin, J W
- Publication Date: 1977-8
Media Info
- Pagination: 291 p.
Subject/Index Terms
- TRT Terms: Conveyors; Excavations; Materials management; Mucking; Pipelines; Pneumatic equipment; Railroad rails; Slurry; Tunneling; Workshops
- Uncontrolled Terms: Hybrids
- Old TRIS Terms: Pneumatic devices; Slurries
- Subject Areas: Bridges and other structures; Construction; Highways; Pipelines; Public Transportation; Terminals and Facilities;
Filing Info
- Accession Number: 00176569
- Record Type: Publication
- ISBN: MA-06-0025
- Report/Paper Numbers: UMTA-MA06-0025-77-19
- Files: TRIS
- Created Date: Aug 19 1981 12:00AM