L.M.S.R. PERMANENT WAY DEVELOPMENTS-3
The L.M.S.R. is at present making use of welding for four main categories of trackwork, namely, re-conditioning worn and damaged switches and crossings; welding of rails into longer lengths; welding electric track components; and welding other track components, such as buffer stops, damaged rails, and wheel stops. For repairs on site portable oxy-acetylene equipment is used, and the welders usually work in pairs so that a lookout man protects both welders. The welding of water troughs into long lengths has also proved satisfactory.
-
Corporate Authors:
Temple Press Limited
161-166 Fleet Street
Longon EC4, England - Publication Date: 1947-8-15
Media Info
- Features: Photos;
- Pagination: p. 181-182
-
Serial:
- RAILWAY GAZETTE
- Volume: 87
Subject/Index Terms
- TRT Terms: Crossovers; Drain pipe; Fabrication; Location; Maintenance of way; Rail joints; Railroad rails; Technology; Welded rail; Welding
- Uncontrolled Terms: Switches
- Geographic Terms: United Kingdom
- Old TRIS Terms: Rail welding; Site fabrication
- Subject Areas: Design; Maintenance and Preservation; Railroads;
Filing Info
- Accession Number: 00037916
- Record Type: Publication
- Files: TRIS
- Created Date: Dec 4 1994 12:00AM