NEW FEDERAL REGULATIONS FOR DREDGED AND FILL MATERIALS
In September 1975, EPA issued the Interim Final Guidelines to be applied by the Corps in evaluating a proposed discharge of dredged or fill material in navigable waters. Both the Corps Regulations and EPA Guidelines allowed 90 days for additional public comment. The comment period has closed and both agencies are analyzing the more than 2000 comments received. The final regulations, possibly incorporating some changes based on the comments, are expected to be issued late this spring. While this feature summarizes the key points of the Regulations and Guidelines, prospective permitters are cautioned to consult the complete text in the Federal Register, because of the large number of modifying conditions and provisos and the complicated language contained in these documents.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/0013936X
-
Corporate Authors:
American Chemical Society
1155 16th Street, NW
Washington, DC United States 20036 -
Authors:
- Smith, D
- Publication Date: 1976-4
Media Info
- Features: References;
- Pagination: p. 328-333
-
Serial:
- Environmental Science & Technology
- Volume: 10
- Issue Number: 4
- Publisher: American Chemical Society
- ISSN: 0013-936X
- EISSN: 1520-5851
- Serial URL: http://pubs.acs.org/journal/esthag
Subject/Index Terms
- TRT Terms: Dredged materials; Dredging; Legal constraints; Policy; Pollution; Pollution control; Regulation; Regulations; Waste disposal; Water pollution
- Subject Areas: Environment; Law; Marine Transportation; Policy;
Filing Info
- Accession Number: 00149745
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Apr 13 1977 12:00AM