LONDON TRANSPORT'S FLEET LINE PROJECT
The author describes the works involved in the first stage of London Transport's $80 million Fleet Line project of which the civil engineering construction is now substantially complete. In addition to the difficulties of fitting in with and connecting to London's existing underground railway lines, the author describes how above-ground structures, such as the Queen Eleanor Memorial at Charing Cross, were supported while the work was under way.(a) /TRRL/
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/0041414X
-
Corporate Authors:
Morgan-Grampian Limited
30 Calderwood Street
London SE18 6QH, England -
Authors:
- Mead, D R
- Publication Date: 1976-11-12
Language
- English
Media Info
- Features: Figures; Photos;
- Pagination: p. 35-39
-
Serial:
- Tunnels & Tunnelling International
- Volume: 8
- Issue Number: 7
- Publisher: Progressive Media Markets, Ltd
- ISSN: 0041-414X
Subject/Index Terms
- TRT Terms: Cast iron; Clay; Concrete; Construction management; Construction projects; Planning; Shielding (Tunneling); Structural design; Subway stations; Subways; Tunnel lining; Tunneling; Tunnels
- Identifier Terms: London Transport
- Uncontrolled Terms: Underground station
- Geographic Terms: United Kingdom
- Old TRIS Terms: Subway design
- ITRD Terms: 4533: Cast iron; 4177: Clay; 4755: Concrete; 3666: Construction method; 1041: Depot (transp); 143: Planning; 3394: Shield driving; 1084: Stop (public transport); 3374: Tunnel; 3385: Tunnel lining; 8119: United Kingdom
- Subject Areas: Bridges and other structures; Construction; Planning and Forecasting; Public Transportation; I54: Construction of Tunnels;
Filing Info
- Accession Number: 00149009
- Record Type: Publication
- Source Agency: Transport and Road Research Laboratory (TRRL)
- Report/Paper Numbers: Analytic
- Files: ITRD, TRIS
- Created Date: Jun 17 1981 12:00AM