C&NW ATTACKS THE TOUGH SPOTS
The production use of a ballast undercutter/cleaner on the Chicago and North Western and the machine's use in conjunction with the installation of a stabilizer fabric between the ballast section and subgrade where it is difficult to keep water away from the track is discussed. C&NW used Mirafi 140, made of two types of continuous filament fibers--one wholly polypropylene and the other a polypropylene core covered with a nylon sheath. This sheath acts to filter fine soil particles from contaminating material above the material and to support the track on the subgrade.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/4175009
-
Corporate Authors:
Murphy-Richter Publishing Company
20 North Wacker Driver
Chicago, IL United States 60606 - Publication Date: 1976-10
Media Info
- Features: Photos;
- Pagination: p. 47-48
-
Serial:
- Progressive Railroading
- Volume: 19
- Issue Number: 10
- Publisher: Trade Press Publishing Corporation
- ISSN: 0033-0817
- Serial URL: http://www.progressiverailroading.com
Subject/Index Terms
- TRT Terms: Ballast mats; Fabrics; Maintenance of way; Mud pumps; Polymers
- Old TRIS Terms: Ballast cleaning; Mud pumping; Track maintenance equipment
- Subject Areas: Maintenance and Preservation; Railroads;
Filing Info
- Accession Number: 00147593
- Record Type: Publication
- Files: TRIS
- Created Date: Feb 16 1977 12:00AM