LOOP ENVIRONMENTAL MONITORING PROGRAM 2000-2001 VEGETATION AND WILDLIFE

The Louisiana Offshore Oil Port (LOOP) Environmental Monitoring Program (EMP) was initiated in 1978 to monitor the condition of the marsh ecosystem surrounding the LOOP pipeline. The goal of the EMP is to determine if the LOOP facility and pipeline adversely impact surrounding wetland plant and wildlife communities as a result of the construction (1978-1981) and operation (1982-current) of the LOOP pipeline. This year's EMP utilized one elevational ground survey, three ground-based vegetative surveys, and four wildlife aerial surveys to generate quantitative and qualitative data for the analysis of impacts. In 2000-2001, C-K Associates conducted the elevational, vegetative, and wildlife surveys as mandated by the EMP. Vegetative biomass and species diversity within existing wetlands were used to estimate primary production within the project area. Low-altitude helicopter flights were used to count muskrats, wading bird/seabird rookeries, and wading bird and pelicans. The monitoring data were compared to control areas within the established corridor and to historical data to identify correlations using standard statistical methods. The construction of the LOOP facility and pipeline resulted in a decrease in marsh surface area and corresponding primary production. The results of the vegetative biomass survey did not indicate that the operation of the LOOP facility and pipeline have recently or historically resulted in adverse impacts to the marsh. Results also indicate the beach-dune area overlaying the subsurface pipeline is stable in regard to elevation and vegetative cover, but exhibits natural shoreline erosion along the Gulf of Mexico. This is significant in regard to the overall stability of the dune itself since open waters border its landward side. Analysis of data generated during the wildlife surveys failed to show any correlation to the construction and operation of the LOOP pipeline, except that wading bird densities decreased during the construction and early recovery years of 1978 through 1984.

Language

  • English

Media Info

  • Media Type: Digital/other
  • Features: Appendices; Figures; References; Tables;
  • Pagination: v.p.

Subject/Index Terms

Filing Info

  • Accession Number: 00941241
  • Record Type: Publication
  • Report/Paper Numbers: FHWA/LA-367,, Final Report,, State PN 736-99-0921
  • Contract Numbers: LTRC No. 01-12MP
  • Files: NTL, TRIS, USDOT
  • Created Date: Mar 31 2003 12:00AM