DEFINING TRIANGULAR PROBABILITY DISTRIBUTIONS FROM HISTORICAL COST DATA
During the development of an automated cost estimating system, several factors led to the selection of the triangular probability-density function to model historical construction costs. The triangular-density function is customarily used when function parameters are directly estimated by experts. A typical example is for estimating activity durations by identifying a minimum value, a most likely value, and a maximum value. These values are then used to construct triangular-density functions to represent uncertain activity durations. For this work, however, it was necessary to estimate parameters of the triangular-density function using historical cost data. A methodology was developed to generate test data and compare three methods of parameter estimation: maximum likelihood, moment matching, and least-squares curve-fitting techniques. It is concluded that optimized moment matching and least-squares techniques produce more accurate parameter estimates, while maximum likelihood estimation yields less accurate results. It is further concluded that the least-squares minimization method always performed as well as or better than the optimized moment matching technique and was therefore selected as the method of choice for the project.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/8675438
-
Corporate Authors:
American Society of Civil Engineers
1801 Alexander Bell Drive
Reston, VA United States 20191-4400 -
Authors:
- Back, W E
- Boles, W W
- Fry, G T
- Publication Date: 2000-1
Language
- English
Media Info
- Features: Appendices; Figures; References; Tables;
- Pagination: p. 29-37
-
Serial:
- Journal of Construction Engineering and Management
- Volume: 126
- Issue Number: 1
- Publisher: American Society of Civil Engineers
- ISSN: 0733-9364
- EISSN: 1943-7862
- Serial URL: http://ascelibrary.org/journal/jcemd4
Subject/Index Terms
- TRT Terms: Accuracy; Automation; Case studies; Construction; Cost estimating; Costs; Curve fitting; Least squares method; Mathematical models; Maximum likelihood method; Optimization; Probability density functions
- Uncontrolled Terms: Moment matching method; Parameter estimation
- Subject Areas: Administration and Management; Construction; Finance; Highways; I10: Economics and Administration;
Filing Info
- Accession Number: 00783775
- Record Type: Publication
- Contract Numbers: CMS 97-13917
- Files: TRIS
- Created Date: Feb 23 2000 12:00AM