NORTHEAST CORRIDOR HIGH-SPEED RAIL PASSENGER IMPROVEMENT PROJECT, TASK 14 MODEL INTERMODAL TERMINAL, UNION STATION, PHASE II: ALTERNATIVE CONCEPTS REPORT

The study constitutes the second phase of Task 14 of the Northeast Corridor High-Speed Rail Passenger Service Improvement Project and has been prepared for the Northeast Corridor Project Office of the Federal Railroad Administration. The purpose of Task 14 is to investigate the conceptual alternatives for an Intermodal Terminal at Union Station, Washington, D.C., and to prepare a detailed conceptual design for the preferred alternative. The report includes plans and sketches, analysis of traffic impact, and preliminary cost estimates for five final alternatives for the Intermodal Terminal at Union Station. The alternatives are evaluated and a preferred concept recommended which involves the shared use of Union Station by the terminal and the National Visitor Center, as proposed by Alternative B-1.

  • Supplemental Notes:
    • See also PB-257053.
  • Corporate Authors:

    Skidmore, Owings and Merrill

    1201 Connecticut Avenue, NW
    Washington, DC  United States  20036

    Office of High Speed Ground Transportation

    Northeast Corridor Transportation Project
    Washington, DC  United States 
  • Publication Date: 1976-6

Media Info

  • Pagination: 167 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00143233
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: Final Rpt., FRA/NEPCO-76-05
  • Contract Numbers: DOT-FR-66017
  • Files: NTIS, TRIS
  • Created Date: Oct 26 1976 12:00AM