MEASUREMENT OF PRESSURE ON THE TRACK BED EXERTED BY VEHICLES RUNNING AT HIGH SPEEDS

BODENDRUCKMESSUNGEN BEI SCHNELLFAHRTEN

Report on the measurements taken by the DB during high speed tests on the line between Bielefeld and Hamm. The article describes the measuring equipment and tells of the results obtained when BR 103 and other locomotives covered 6 types of track at 160 km/h: Slab track, track laid on ballast and various types of concrete ties, with and without rubber pads, and track with wooden crossties.

  • Corporate Authors:

    Hestra Verlag

    Holzhofallee 33, Postfach 4244
    6100 Darmstadt 1,   Germany 
  • Authors:
    • Erler, H J
  • Publication Date: 1977-9

Language

  • German

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00169973
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Files: TRIS
  • Created Date: Jan 30 1978 12:00AM