HOW POST-TENSIONING STABILIZES THE PIERS OF AN ANCIENT BRIDGE
The paper reports how a post-tensioning system has been used successfully to increase the stability of two piers of the 74-year-old Alexandra Bridge spanning the Ottawa River opposite the Parliament Buildings. Due to the porous concrete of piers 2 and 3 below water level a casing was needed to prevent the sides of the anchor bolts' holes from collapsing during drilling.
-
Corporate Authors:
Southam Business Publications Limited
1450 Don Mills Road
Don Mills, ONo, Canada -
Authors:
- Hancock, N
- Publication Date: 1977-2
Media Info
- Pagination: p. 48-49
-
Serial:
- Engineering and Contract Record
- Volume: 90
- Issue Number: 2
- Publisher: Southam Business Publications
Subject/Index Terms
- TRT Terms: Bolts; Bridge piers; Bridges; Concrete structures; Piers (Supports); Piers (Wharves); Reconstruction; Repairing; Tensioning
- Old TRIS Terms: Bridge repairs
- Subject Areas: Bridges and other structures; Railroads;
Filing Info
- Accession Number: 00167968
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Jan 13 1978 12:00AM