THE OPERATION OF CONSTRUCTION MACHINERY ON CONSTRUCTION SITES. PART 2

EXPLOTACION DE LA MAQUINARIA EN OBRA (II)

The estimation of the output on construction sites of various types of construction plant is carried out by one of the following methods: (a) comparison between structures similar in conditions; (b) a study of typical production charts and correction charts; (c) study of the work cycle and the particular conditions under which it is carried out. For each method, the author presents examples based on charts for different machines (scrapers, tractors with tiltdozers, hydraulic excavators, crawler-mounted loader) which are available in an appendix. /TRRL/

  • Corporate Authors:

    Spanish Assn of Mach Tech for Constr & Pub Works

    Calle Cruz del Sur 2
    Madrid-30,   Spain 
  • Authors:
    • Rojo, J
  • Publication Date: 1975-7-8

Language

  • Spanish

Media Info

  • Features: Figures; Photos; Tables;
  • Pagination: p. 6-31
  • Serial:
    • ATEMCOP
    • Issue Number: 59
    • Publisher: Asoc Espanola Tec Maquinaria Construc Obras Publ

Subject/Index Terms

Filing Info

  • Accession Number: 00165675
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Report/Paper Numbers: Analytic
  • Files: ITRD, TRIS
  • Created Date: May 3 1978 12:00AM