FLOOD AND ITS REMEDIES IN SEIKAN TUNNEL

A flood occurred in the work tunnel and water flow reached a rate of 14 cubic meters per minute at a point 16.89 km from the mouth of the tunnel in an area of sand tuff and silt rock. The author describes the remedial measures taken, i.e., pumping, basalt injections and detouring of the fracture zone.