GENERAL ELECTRIC AND TRACK INSPECTION CARS FOR SHINKANSEN
Description is given of the inspection work carried out by this train: 23 tasks concerning track, 10 tasks concerning the power circuit and the catenary, 6 tasks concerning signalling, 6 tasks concerning telecommunications. The train operates once a week at a speed of 210 km/h and carries out additional inspections at various times.
-
Corporate Authors:
International Railway Congress Association
17-21 rue de Louvrain
1000 Brussels, Belgium -
Authors:
- Suzuki, H
- Publication Date: 1977-4
Media Info
- Features: Figures; Photos; Tables;
- Pagination: p. 185-192
-
Serial:
- RAIL INTERNATIONAL
- Volume: 8
- Issue Number: 4
Subject/Index Terms
- TRT Terms: Catenaries (Railroads); High speed vehicles; Inspection; Inspection cars; Telecommunications; Traffic signal control systems
- Old TRIS Terms: Signal systems
- Subject Areas: Operations and Traffic Management; Railroads; Vehicles and Equipment;
Filing Info
- Accession Number: 00162953
- Record Type: Publication
- Source Agency: International Union of Railways
- Files: TRIS
- Created Date: Oct 13 1977 12:00AM