NEW SIGNAL BOX AT VERSAILLES-CHANTIERS
LE NOUVEAU POSTE DE VERSAILLES-CHANTIERS
The section under the control of the new box described which was opened in January 1977, runs from Sevres Rive-Gauche to St-Quentin en Yvelines, both stations included, and covers 38 km. The box works the points and signals and controls traffic fully over this section of line. The actual line situation and position of trains is known at any moment by means of automatically operated display panels and cathode screens, the programming of the train servicer, and automatic route setting.
-
Corporate Authors:
Societe Nationale des Chemins de Fer Francais
92 rue Bonaparte
75 Paris 6e, France -
Authors:
- Audouin, J
- RETIVEAU, R
- Publication Date: 1977-3
Language
- French
Media Info
-
Serial:
- REVUE GENERALE DES CHEMINS DE FER
- Volume: 96
Subject/Index Terms
- TRT Terms: Automatic control; Automatic train control; Cathode ray tubes; Centralized traffic control; Railroad signaling; Railroad signals; Railroads; Signaling; Technology
- Geographic Terms: France
- Old TRIS Terms: Automatic control systems; Interlocking
- Subject Areas: Operations and Traffic Management; Railroads;
Filing Info
- Accession Number: 00167986
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Jan 13 1978 12:00AM