NUCLEAR POWERED TANKER. MARITIME DESIGN STUDY FOR 600,000 DWT NUCLEAR TANKER. VOLUME 4. ENGINEERING AND PRODUCTION SUPPORT
The study extended over a period of approximately six months. The principal objectives of the study were to develop the preliminary design for a 600,000 DWT nuclear power ULCC, perform ship safety analyses, develop a preliminary quality assurance program, develop a ship construction schedule of key events, develop the shipyard/reactor manufacturer scope of supply, define the interfaces specifically related to the nuclear propulsion plant.
-
Supplemental Notes:
- See also Volume 3, PB-269 725. Paper copy also available in set of 5 reports PC E17, PB-269 722-SET.
-
Corporate Authors:
Newport News Shipbuilding and Dry Dock Company
Hull Technical Department
Newport News, VA United States 23607 Office of Industrial Programs, 1200 New Jersey Avenue, SE
Washington, DC United States 20590 - Publication Date: 1975-12
Media Info
- Pagination: 170 p.
Subject/Index Terms
- TRT Terms: Construction; Costs; Design; Logistics; Nuclear powered ships; Nuclear reactors; Process control; Procurement; Propulsion; Quality assurance; Quality control; Safety; Shipbuilding; Statistical quality control; Tankers; Very large crude carriers
- Uncontrolled Terms: Design criteria
- Old TRIS Terms: Marine nuclear propulsion; Nuclear reactor construction; Nuclear reactor safety; Ship construction costs; Tanker ships
- Subject Areas: Construction; Design; Finance; Freight Transportation; Marine Transportation; Safety and Human Factors;
Filing Info
- Accession Number: 00166762
- Record Type: Publication
- Source Agency: National Technical Information Service
- Report/Paper Numbers: MA/RD-920-77046 Final Rpt., 1010-M/1-Vol-4
- Contract Numbers: MA-5-38022
- Files: TRIS, USDOT
- Created Date: Oct 29 1978 12:00AM