3.3 KV ELECTRICAL SYSTEMS FOR ESSO PRODUCT TANKERS
The 3300 V generation and distribution systems were installed on the 20,000 DWT product tankers "ESSO Mersey" and "ESSO Clyde" which entered service in 1972. Operational experience is reviewed, in particular quick turnaround times were achieved. Design considerations for the 3.3 KV system are dealt with in some detail, and it is compared with the 440 V system.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/03093948
-
Corporate Authors:
Institute of Marine Engineers
Memorial Building, 76 Mark Lane
London EC3R 7JN, England -
Authors:
- Mciver, J D
- Publication Date: 1975-4-16
Media Info
- Pagination: 15 p.
-
Serial:
- Institute of Marine Engineers Transactions
- ISSN: 0309-3948
Subject/Index Terms
- TRT Terms: Electric power generation; Electric power transmission; Electrical systems; Turnaround time
- Subject Areas: Energy; Marine Transportation;
Filing Info
- Accession Number: 00159985
- Record Type: Publication
- Source Agency: Ship Research Institute of Norway
- Files: TRIS
- Created Date: Sep 20 1977 12:00AM