CLARIFYING GROUTING REQUIREMENTS ASSOCIATED WITH SOIL AND ROCK TUNNEL LINERS
The requirement to perform grouting in conjunction with tunnel lining placement can be a costly and time consuming operation in the tunnel excavation/lining process. A better understanding of the technical reasoning for requiring such grouting and a more standardized nomenclature by the underground engineering and construction industry could help reduce misunderstandings, eliminate unnecessary costs, improve construction schedules and avoid potential claims.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/isbn/9054109319
-
Corporate Authors:
AA Balkema
P.O. Box 1675
Rotterdam, Netherlands BR-3000 -
Authors:
- Henn, R W
- Clough, R G
- Teetes, G R
-
Conference:
- North American Tunneling '98
- Location: Newport Beach, California
- Date: 1998-2-21 to 1998-2-25
- Publication Date: 1998
Language
- English
Media Info
- Features: Figures;
- Pagination: p. 47-53
Subject/Index Terms
- TRT Terms: Grouting; Tunnel lining; Tunneling
- Subject Areas: Bridges and other structures; Construction; Highways; I54: Construction of Tunnels;
Filing Info
- Accession Number: 00753905
- Record Type: Publication
- ISBN: 9054109319
- Files: TRIS
- Created Date: Sep 21 1998 12:00AM