ABUKUMA-GAWA BRIDGE OF THE TOHOKU SHINKANSEN

Problems are described of bridge erection, of placing and curing of the concrete, of prevention of cracks in this 526.5 m double-track reinforced-concrete bridge with its 5 continuous spans of 105 m each, reportedly the longest for a rail bridge of this type.

  • Availability:
  • Corporate Authors:

    Japan Railway Engineers' Association

    2-5-18 Otemachi, Chiyoda-ku
    Tokyo,   Japan 
  • Authors:
    • Kudo, H
  • Publication Date: 1976

Media Info

  • Features: Figures; Photos; Tables;
  • Pagination: p. 17-19
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00157928
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Files: TRIS
  • Created Date: Aug 15 1977 12:00AM