PIPELAYING IN DEEP WATER WITH COMBINED BARGE AND TENSIONER CONTROL
ROHRVERLEGUNG IN TIEFEM WASSER MIT KOMBINIERTER ROHRVERLEGER- UND TENSIONERSTEUERUNG
The method for laying pipes in depths of water in the range of 300-600 meters is outlined. A block diagram of the process system and the control system is provided, and all interesting values as well as the behavior of the complete system are calculated for a particular example.
-
Supplemental Notes:
- International Conference and Exhibition for Ocean Engineering and Marine Science, Third: Interocean '76, Duesseldorf, Germany, June 15-19 1976.
-
Corporate Authors:
Seehafen-Verlag Erik Blumenfeld
Celsiusweg 15, Postfach 1347
2000 Hamburg 50, Germanyerlag Erik Blumenfeld
Celsiusweg 15
D-2000 Hamburg 50, Germany -
Authors:
- Droste, W
-
Conference:
- International Conference and Exhibition for Ocean Engineering and Marine Science, Third: Interocean '76
- Location: Duesseldorf , Germany
- Date: 1976-6-15 to 1976-6-19
- Publication Date: 1976
Language
- German
Media Info
- Features: References;
- Pagination: p. 702-713
-
Serial:
- Volume: 1
Subject/Index Terms
- TRT Terms: Barge operations; Barges; Pipe laying; Underwater pipelines
- Candidate Terms: Pipe laying ships
- Subject Areas: Marine Transportation; Terminals and Facilities;
Filing Info
- Accession Number: 00157644
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Aug 15 1977 12:00AM