A LOOK AT A RECENT GAS TURBINE SHIP VENTURE
The basic design considerations for the GTS Adm. Wm. M. Callaghan are presented and compared to the operating experiences with these considerations. Dollar costs are compared to costs in a conventional steam plant. A gas turbine ship design is outlined for a 200,000 DWT tanker.
-
Corporate Authors:
Annual Tanker Conference (14th)
Pocono Manor Inn
Pocono Manor, PA United States -
Authors:
- Zeien, C
- Conference:
- Publication Date: 1969-5-12
Media Info
- Pagination: p. 131-158
Subject/Index Terms
- TRT Terms: Gas turbines; Performance; Propulsion
- Subject Areas: Marine Transportation; Vehicles and Equipment;
Filing Info
- Accession Number: 00034925
- Record Type: Publication
- Source Agency: American Petroleum Institute
- Files: TRIS
- Created Date: Oct 27 1973 12:00AM