SNCB CHOPPERS AND INTERFERENCE
Two-rail and single-rail track circuit problems are examined, the latter introducing limitation of traction-current harmonics and abolishing very long track circuit length. With greater application of thyristors, the difficulty in compliance with laid-down limitation standards is increased.
-
Corporate Authors:
Mechanical Engineering Publications
Penthouse 1, 15 West 55th Street
New York, NY United States 10019 -
Authors:
- SQUILBIN, M
- Publication Date: 1977-3
Media Info
- Features: Figures;
- Pagination: p. 55-57
-
Serial:
- RAILWAY ENGINEER
- Volume: 2
- Issue Number: 2
Subject/Index Terms
- TRT Terms: Chopper circuits; Electromagnetic interference; Harmonics; Insulation systems; Joints; Signaling; Telecommunications; Track circuits
- Identifier Terms: Societe Nationale des Chemins de Fer Belges
- Uncontrolled Terms: Insulated joints
- Old TRIS Terms: Chopper control
- Subject Areas: Bridges and other structures; Operations and Traffic Management; Railroads;
Filing Info
- Accession Number: 00153800
- Record Type: Publication
- Source Agency: Railway Engineer
- Files: TRIS
- Created Date: Jul 19 1977 12:00AM