CONSOLIDATION WORK ON THE VAL-DES-ESCHOLIERS CUTTING

TRAVAUX DE CONFORTEMENT DE LA TRANCHEE DU VAL-DES-ESCHOLIERS

A high chalk ridge rises above the Val-des-Escholiers cutting on the Mulhouse-Paris up line and falling rocks can be a serious danger for passing trains. Various protection systems have been tried without giving absolutely satisfactory results. The solution adopted has been to build a reinforced earth wall. This wall is formed of earth and galvanized steel bracing with strips 60-80 mm thick; the parts away from the track stand free while the parts towards the track have a reinforced concrete casing.

  • Corporate Authors:

    Societe Nationale des Chemins de Fer Francais

    92 rue Bonaparte
    75 Paris 6e,   France 
  • Authors:
    • Oddos, P
  • Publication Date: 1977-2

Language

  • French

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00153794
  • Record Type: Publication
  • Source Agency: Revue Generale des Chemins de Fer
  • Files: TRIS
  • Created Date: Jul 19 1977 12:00AM