REPLACEMENT OF EXPANSION JOINT OF "RABINDRA SETU" (HOWRAH BRIDGE), CALCUTTA, INDIA
This paper deals with the very interesting subject of replacement of Expansion Joints of a 50 year old balanced cantilever steel bridge by judiciously using a set of reinforced elastomeric slab seal type expansion joint. The expansion joints installed 50 years ago have been corroded and eroded with time, damaging even the replacement systems which might have been provided originally. As the replacement is being done on a bridge which is on regular use the entire work is being carried out in the night only. Care has been taken to ensure possibility of replacement of the elastomer slab seal at later dates, if necessary, by providing stainless steel fixing bolts and nuts and stainless steel bed plates. The specification and methods used for fixing reinforced elastomer slab seal units have been elaborately dealt with in this paper.
-
Corporate Authors:
American Concrete Institute (ACI)
38800 Country Club Drive
Farmington Hills, MI United States 48331 -
Authors:
- Datta, S
- Ray, M
- Mitra, T N
-
Conference:
- Fourth World Congress on Joint Sealants and Bearing Systems for Concrete Structures
- Location: Sacramento, California
- Date: 1996-9-29 to 1996-10-3
- Publication Date: 1997
Language
- English
Media Info
- Features: Figures; Tables;
- Pagination: p. 481-496
Subject/Index Terms
- TRT Terms: Bridges; Cantilever bridges; Expansion joints; Sealing; Steel; Structures
- Subject Areas: Bridges and other structures; Design; Highways; I24: Design of Bridges and Retaining Walls;
Filing Info
- Accession Number: 00779801
- Record Type: Publication
- Report/Paper Numbers: SP 164-25
- Files: TRIS
- Created Date: Dec 14 1999 12:00AM