FREEZE THAW STUDY
Research was conducted to determine whether five days of controlled temperature moist curing was necessary to ensure durability of precast structures along Massachusetts highways. A number of test cylinders and prisms were cast from a typical precast mix, which contained an air-entrainment additive. Half the samples were moist-cured for a total of seven days at 70 deg F (21 deg C), then stored outdoors; the other half were moist-cured for only two days and immediately exposed to winter weather conditions. Following two months of outdoor storage, the prisms were resaturated and tested for freeze-thaw durability using procedures adapted from ASTM C 666 and ASTM C 215. After more than 300 cycles of rapid freezing and thawing no severe degradation was observed in any of the samples. It was concluded that a full five day moist-cure was not required to achieve acceptable freeze-thaw durability when using the current Massachusetts Highway Department approved precast concrete mix design.
-
Corporate Authors:
University of Massachusetts, Amherst
Transportation Center, 130 Natural Resources Road
Amherst, MA United States 01003Massachusetts Highway Department
10 Park Plaza
Boston, MA United States 02116-3973Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC United States 20590 -
Authors:
- Kunhardt, H
- Mogawer, W S
- Publication Date: 1997-12
Language
- English
Media Info
- Pagination: 22 p.
Subject/Index Terms
- TRT Terms: Air entraining agents; Cold weather; Concrete curing; Freeze thaw durability; Precast concrete
- Subject Areas: Highways; Materials; I32: Concrete;
Filing Info
- Accession Number: 00780269
- Record Type: Publication
- Source Agency: University of Massachusetts, Amherst
- Report/Paper Numbers: UMTC-97-17,, Final Research Report
- Files: TRIS, USDOT
- Created Date: Dec 15 1999 12:00AM