RAILROAD DATA INTEGRATION FOR TRANSPORTATION MANAGEMENT CENTERS
This report describes a project plan to communicate train information (i.e., train position, direction, speed, and length) to a transportation management center (TMC) for improved traffic operations. Several different approaches are discussed. The report recommends using a Highway-Railroad Intersection monitoring device on the railroad controller to gather train data. The data would be brought back to a TMC via a communications link such as cellular, radio-frequency based communication, or wireline. The report also recommends starting with a laboratory demonstration using the TransLink (registered trademark) laboratory facilities. Based on the finding from this laboratory demonstration, the most successful application could be moved forward to a more detailed field demonstration.
- Record URL:
-
-
Supplemental Notes:
- Research study title: TransLink Research Program.
-
Corporate Authors:
Texas Transportation Institute
Texas A&M University System, 1600 E Lamar Boulevard
Arlington, TX United States 76011Texas Department of Transportation
Research and Technology Transfer Office, P.O. Box 5051
Austin, TX United States 78763-5051 -
Authors:
- Poe, C
- Ruback, L
- Bartoskewitz, R
- Halloin, D
- Publication Date: 1996-11
Language
- English
Media Info
- Features: Figures; References;
- Pagination: 38 p.
Subject/Index Terms
- TRT Terms: Data communications; Highway operations; Railroad grade crossings; Traffic control; Traffic control centers; Train operation; Transportation safety
- Uncontrolled Terms: Data integration
- Subject Areas: Highways; Operations and Traffic Management; Railroads; Safety and Human Factors; I73: Traffic Control;
Filing Info
- Accession Number: 00762952
- Record Type: Publication
- Report/Paper Numbers: TX-99/2988-1,, Interim Res Rept 2988-1
- Contract Numbers: Study No. 7-2988
- Files: NTL, TRIS, ATRI, STATEDOT
- Created Date: Apr 2 2001 12:00AM