CONSTRUCTION OF CAIRO METRO LINE 2
A new 30 km underground railway line is being built in the heart of Cairo, one of the world's largest and fastest growing cities. Cairo Metro Line 2 will link the pyramids of Giza on the west bank of the Nile to central and northern Cairo on the opposite bank when completed in 2001. This paper briefly describes the methodology used for construction of the 18 stations, tunnels and workshop which make up this US$2 billion project - including the first ever tunnel under the Nile. A number of innovative solutions were developed to solve the problem of water leakage during construction. (A)
-
Corporate Authors:
Thomas Telford Limited
London, United Kingdom -
Authors:
- MADKOUR, A
- HUDSON, M A
- BELLAROSA, A
- Conference:
- Publication Date: 1999
Language
- English
Media Info
- Features: References;
- Pagination: p. 103-17
-
Serial:
- Volume: 132
- Issue Number: 2/3
Subject/Index Terms
- TRT Terms: Construction management; Design; Subways; Tunnels; Water
- Geographic Terms: Egypt
- ITRD Terms: 3666: Construction method; 9011: Design (overall design); 8031: Egypt; 3374: Tunnel; 1191: Underground railway; 4355: Water
- Subject Areas: Bridges and other structures; Construction; Design;
Filing Info
- Accession Number: 00771438
- Record Type: Publication
- Source Agency: Transport Research Laboratory
- Files: ITRD
- Created Date: Nov 4 1999 12:00AM