NCHRP REPORT 350 EVALUATION OF THE NEBRASKA THRIE-BEAM TRANSITION
This project was initiated to develop a thrie-beam transition to a concrete bridge rail which is capable of passing the criteria set forth in NCHRP Report 350. The system currently used by the Nebraska Department of Roads was redesigned with the help of the BARRIER VII computer program. This redesigned system was subjected to one test with a 2000-kg pickup impacting the system at 100 km/h and 25 degrees. The vehicle was redirected in a stable and controlled manner, but considerable occupant compartment damage occurred during the impact, resulting in failure of the test.
- Record URL:
-
-
Corporate Authors:
University of Nebraska, Lincoln
Midwest Roadside Safety Facility
2200 Vine Street, Whittier Building
Lincoln, NE United States 68583-0853Nebraska Department of Roads
1500 Highway 2, P.O. Box 94759
Lincoln, NE United States 68509Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC United States 20590 -
Authors:
- Pfeifer, B G
- Faller, R K
- Reid, J D
- Publication Date: 1998-5
Language
- English
Media Info
- Features: Appendices; Figures; Photos; References; Tables;
- Pagination: 63 p.
Subject/Index Terms
- TRT Terms: Bridge railings; Computer aided design; Crash tests; Crashes; Guardrail transition sections; Guardrails; Impact; Loss and damage; Pickup trucks; Speed; Testing; Thrie beams
- Identifier Terms: NCHRP Report 350
- Uncontrolled Terms: Damages; Impact angle; Impact speed; Interior; Redirection
- Subject Areas: Design; Highways; Research; Safety and Human Factors; I85: Safety Devices used in Transport Infrastructure;
Filing Info
- Accession Number: 00749973
- Record Type: Publication
- Report/Paper Numbers: TRP-03-70-98, Final Report
- Contract Numbers: SPR-PL-1(34)P500
- Files: NTL, TRIS, ATRI, USDOT, STATEDOT
- Created Date: Jun 16 1998 12:00AM