CASCET A COMPUTER AIDED SHIP COST ESTIMATING TOOL

This paper describes a Computer Aided Cost Estimating Tool (CASCET), which has been designed to assist labour resource estimation at the tendering stage of a warship construction project and also to enable warship design optimisation to be carried out. In this mode, the labour module of CASCET presented in this paper is linked with other modules to provide a "whole ship" estimating capability. When linked to a computer-aided warship concept design system, this provides a powerful design optimisation tool.

  • Supplemental Notes:
    • PRADS 95, 6th Intl Symposium on Practical Design of Ships and Mobile Units; 17-22 Sept 1995; Seoul, Korea. Procs. Publ by Soc Naval Architects of Korea, ISBN 89-950016-2-3. Vol 2, p 2.1228 [12 p, 8 ref, 3 tab, 4 fig]
  • Authors:
    • Humphries, A D
    • Shenoi, R A
  • Publication Date: 1995

Language

  • English

Subject/Index Terms

Filing Info

  • Accession Number: 00727855
  • Record Type: Publication
  • Source Agency: British Maritime Technology
  • Files: TRIS
  • Created Date: Nov 4 1996 12:00AM