10TH STREET TROLLEY FEASIBILITY STUDY

The 10th Street Trolley Feasibility Study was an approximately nine-month period of analysis of the engineering, economic, and social feasibility of reintroducing an electric heritage trolley to the 10th Street corridor in Omaha, Nebraska. From the feasibility study analysis, a recommended alignment was presented to the project technical and policy committees, along with construction and operating cost estimates and various system design elements. The recommendations are currently being reviewed by the city council, the transit system board of directors, and the mayor's office. A neighborhood system design charrette (French for "work in progress") is in the organizational stages.

Language

  • English

Media Info

  • Features: Figures;
  • Pagination: p. 70-72

Subject/Index Terms

Filing Info

  • Accession Number: 00721848
  • Record Type: Publication
  • ISBN: 0965231003
  • Files: TRIS, STATEDOT
  • Created Date: Jun 5 1996 12:00AM