THE DB'S MUNICH TRACK RENEWAL SECTION WORKING ALTERNATELY ON TWO LINES IN 1975 USING A ROSTER SYSTEM AND TWO WORK CREWS (UP2)
BAUSTELLENSERIE 1975 DER DB MUECHEN IM ZWEISCHICHTEN SPRINGSYSTEM (UP2)
Munich's regional headquarters renewed 56.4 km of track on 13 sections of two different lines in less than 9 months in 1975. The schedule for this work was fixed so that the UP2 track renewal train was used alternatively on the two lines. The authors describes the results obtained and the experience acquired during this work.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/00132810
-
Corporate Authors:
Dr Arthur Tetzlaff Verlag
Niddastrasse 64
Frankfurt am Main, Germany -
Authors:
- Kraft, W
- Kaiser, D
- Publication Date: 1976-3
Language
- German
Media Info
- Features: References; Tables;
- Pagination: p. 103-106
-
Serial:
- Eisenbahningenieur
- Volume: 27
- Issue Number: 3
- Publisher: Tetzlaff Verlag GmbH
- ISSN: 0013-2810
Subject/Index Terms
- TRT Terms: Maintenance of way; Railroad tracks; Track laying
- Identifier Terms: Deutsche Bahn; Deutsche Bundesbahn
- Old TRIS Terms: Track maintenance equipment; Track renewals
- Subject Areas: Maintenance and Preservation; Railroads;
Filing Info
- Accession Number: 00136419
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Aug 3 1976 12:00AM