A CASE HISTORY: AGIP BARBARA LATERAL PIPELINE INSTALLATION

In this paper, a case history of a subsea, piggable, lateral pipeline tie-in is given. The tie-in was made in 75m water depth to an existing pipeline where no preplanned lateral tap assembly was in p;lace. The paper describes an efficient system which was used to affect the tie-in.

  • Supplemental Notes:
    • "OTC '89", 21st Annual Offshore Technology Conference held Houston May 1-4 1989, Vol. 3, p.525 [8 pp., 7 fig., 2 phot.]
  • Authors:
    • Ghielmetti
    • A Schmitz, T R
  • Conference:
  • Publication Date: 1989

Language

  • English

Subject/Index Terms

Filing Info

  • Accession Number: 00696064
  • Record Type: Publication
  • Source Agency: British Maritime Technology
  • Files: TRIS
  • Created Date: Aug 14 1995 12:00AM