AIR TRANSPORTABLE MOORING-CONSTRUCTION SYSTEM FOR T-5 TANKERS
The U.S. Army Mobility Equipment Research and Development Center has designed, fabricated, and tested a mooring-construction system in which each component is transportable in a C-130 aircraft. The function of the system is to establish a mooring capable of accommodating a T-2 tanker (16,500 DWT) or a T-5 tanker (25,000 DWT) at an offshore location while bulk fuel is discharged through pipelines or hoselines to onshore storage facilities. The system is designed for beach-to-sea installation within 48 hours after arriving at the beach worksite. (Author)
-
Corporate Authors:
Army Mobility Equipment R&D Center
Fort Belvoir, VA United States -
Authors:
- Mayo, H C
- Publication Date: 1971-11
Media Info
- Pagination: 156 p.
Subject/Index Terms
- TRT Terms: Mooring; Mooring anchors; Moorings; Offshore moorings; Tankers
- Old TRIS Terms: Tanker moorings
- Subject Areas: Marine Transportation; Terminals and Facilities;
Filing Info
- Accession Number: 00033641
- Record Type: Publication
- Source Agency: National Technical Information Service
- Report/Paper Numbers: USAMERDC-2016
- Files: TRIS
- Created Date: Aug 25 1972 12:00AM