PERMANENT MOORING SYSTEM FOR THE VEGA FIELD: DESIGN, FABRICATION, AND INSTALLATION

In mid 1987 a 250 000dwt converted tanker will be connected, through a rigid mooring yoke, to an articulated column which was installed during October 1986 in the VEGA field offshore from Sicily. The ARC-YOKE Mooring System is equipped to handle an estimated production of 60 000 barrels per day with a system allowing addition of diluent to the crude circulation in order to avoid clogging. The paper gives a complete description of the system and some details of the fabrication of the most noteworthy components, such as the large-size universal and triaxial joints. A large part of the paper is also devoted to the column installation, which resorted to original procedures in order not to require the need for underwater assistance.

  • Supplemental Notes:
    • Proceedings of the 19th Annual Offshore Technology Conference, Houston, Texas, 27-30 Apr. 1987, Vol. 3, p. 361 [8 pp., 4 ref., 5 fig.]
  • Authors:
    • Baudry, Y J
    • Maisonneuve, A
    • Delepine, Y M
  • Conference:
  • Publication Date: 1987

Language

  • English

Subject/Index Terms

  • Subject Areas: Marine Transportation;

Filing Info

  • Accession Number: 00692569
  • Record Type: Publication
  • Source Agency: British Maritime Technology
  • Files: TRIS
  • Created Date: Aug 14 1995 12:00AM