ST CLAIR RIVER PROGRESS

This article describes the use of the EPB Tunnel Boring Machine (TBM) for excavating the railway tunnel under the St Clair river between Sarnia in Canada and Port Huron, USA. The tunnel is sandwiched in a narrow band of soft clay with only half a tunnel diameter of cover between the river bed and the hard shale bedrock. Details are provided of: a) excavation; b) placement and construction of the precast concrete tunnel lining; c) tunnel profile. Special attention is given to the design of the segment lining. An elastomeric compression gasket is used to ensure that there is no water inflow through the segment joints. The grouting of the tunnel's annulus in order to minimize ground settlement is also described in greater detail, as is the method used to both monitor and limit ground movement under Esso's research building.

  • Availability:
  • Corporate Authors:

    THE MINING JOURNAL LTD

    60 WORSHIP STREET
    LONDON,   United Kingdom  EC2A 2HD

    THE MINING JOURNAL

    60 WORSHIP STREET
    LONDON,   United Kingdom  EC2A 2HD
  • Authors:
    • Wallis, S
  • Publication Date: 1994-5

Language

  • English

Media Info

  • Features: References;
  • Pagination: N5-N11
  • Serial:
    • WORLD TUNNELLING
    • Volume: 7
    • Issue Number: 4
    • Publisher: THE MINING JOURNAL LTD
    • ISSN: 0956-8700

Subject/Index Terms

Filing Info

  • Accession Number: 00665322
  • Record Type: Publication
  • Source Agency: Transport Research Laboratory
  • Files: ITRD
  • Created Date: Sep 9 1994 12:00AM