EARLY FIELD EXPERIENCE WITH SUPERPAVE

The ninth Specific Pavement Study (SPS-9) in the Strategic Highway Research Program's Long Term Pavement Performance (LTPP) project will validate the SUPERPAVE specifications and mix design method in the context of a controlled field performance experiment. The main SPS-9 pavement construction activity will take place in 1994, 1995 and 1996. However, four pilot projects (SPS-9P) were built in 1992 to gain the benefit of early field experience with the tentative SUPERPAVE specifications, test methods and mix design method before the SHRP research program ended in March 1993. Several additional SPS-9P projects are planned for 1993. The design and construction of four SPS-9P pavements are briefly described. Initial observations of field performance and preliminary estimates of long-term performance obtained with the performance prediction models in the SUPERPAVE software are presented.

Language

  • English

Media Info

  • Features: References; Tables;
  • Pagination: p. 88-101

Subject/Index Terms

Filing Info

  • Accession Number: 00666152
  • Record Type: Publication
  • Report/Paper Numbers: VTI 1A, Part 3
  • Files: TRIS, ATRI
  • Created Date: Sep 23 1994 12:00AM