NEW TYPE OF PREFABRICATED BRIDGE
NUEVO TIPO DE PUENTE PREFABRICADO
Details are given of a type of prefabricated bridge for spanning railway lines. Thanks to prefabrication and maximum lightness, installation is reduced to the simple in-situ excavation of the foundations and erection of the precast units. The project described consists of three semi-continuous spans (elimination of transverse joints) 7.70, 12.60 and 7.70 m respectively. The structure comprises three components: pier, box girder and deck slab. The flexibility of the system facilitates the construction of a wide variety of spans and the erection of one-, two- or three-lane structures. The erection process, equipment needed and calculation assumptions are described. /TRRL/
-
Corporate Authors:
Ultimas Noticias de Hormigon Pretensado
Instituto Eduardo Torroja
Madrid 16, Spain -
Authors:
- Aquilo, M
- Ordonez, J A
- MARTINEZ, J
- Publication Date: 1972-1-3
Language
- Spanish
Media Info
- Features: Photos;
- Pagination: p. 101-108
-
Serial:
- Hormigon y Acero
- Issue Number: 102
- Publisher: Instituto Eduardo Torroja
Subject/Index Terms
- TRT Terms: Box girder bridges; Box girders; Bridge decks; Bridge piers; Bridge superstructures; Bridges; Building; Concrete bridges; Construction; Construction management; Facilities; Installation; Overpasses; Precast concrete; Prefabricated structures; Slabs; Thinness
- Uncontrolled Terms: Bridge spans; Slenderness ratio
- ITRD Terms: 3474: Box girder; 3455: Bridge; 3482: Bridge deck; 3434: Bridge pier; 3638: Prefabrication; 3491: Slab
- Subject Areas: Bridges and other structures; Construction; Design; Highways; Maintenance and Preservation; I24: Design of Bridges and Retaining Walls; I53: Construction of Bridges and Retaining Walls;
Filing Info
- Accession Number: 00097062
- Record Type: Publication
- Source Agency: Transport and Road Research Laboratory (TRRL)
- Files: ITRD, TRIS
- Created Date: Jul 24 1975 12:00AM