AN INVESTIGATION OF LOAD TRANSFER IN MULTI-BEAM PRESTRESSED BOX GIRDER BRIDGES. FINAL REPORT

This report describes a series of field tests of multi-beam prestressed box girder bridges. The objectives of the tests were to investigate the in situ performance of the grouted shear keys, located at the joints between adjacent girders, and to identify causes for joint distress observed on some bridges of this type. The tests consisted of monitoring relative displacements occurring across the intergirder joints, as well as bending strains in the girders themselves, during passages of a preweighed test vehicle. The test vehicle consisted of a fully loaded tandem axle dump truck with axle loads typically in the range of 18 kips (80 kN). Relative displacements were measured with an especially designed transducer, having a resolution on the order of 0.1 mil (.00254 mm), which was bonded to the underside of the bridge across the intergirder joints. Bending strains in the girders were measured with conventional foil strain gages, having a gage length of 1.5 in. (38 mm), bonded to the underside of the beams along their centerlines. A total of five bridges were tested; one bridge was tested on two occasions, both before and after attempted joint repairs. All of the bridges tested had some joints exhibiting relative displacements large enough to indicate a fractured shear key. Joints for which there were obvious indications of joint problems (leakage through the joint or reflective cracking in the deck above the joint) expectedly indicated large relative displacements. Other joints, which as yet had no readily observable problems, also indicated fractured shear keys. There would therefore appear, at least in some circumstances, to be a lag between the time when a shear key is fractured and observable joint problems are manifested. Typically joints exhibiting the largest relative displacements were those adjacent to the normal wheel tracks in the driving lanes, indicating that shear key failure is related to load transfer demands placed upon the intergirder joints.

  • Corporate Authors:

    Case Western Reserve University

    Department of Civil Engineering, 10900 Euclid Avenue
    Cleveland, OH  United States  44106-7201

    Ohio Department of Transportation

    25 South Front Street
    Columbus, OH  United States  43215

    Federal Highway Administration

    1200 New Jersey Avenue, SE
    Washington, DC  United States  20590
  • Authors:
    • Huckelbridge, A A
    • El-Esnawi, H
    • Moses, F
  • Publication Date: 1993-9

Language

  • English

Media Info

  • Features: Figures; Photos; References;
  • Pagination: 109 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00647338
  • Record Type: Publication
  • Report/Paper Numbers: FHWA/OH-94/002
  • Contract Numbers: State Job 14511(0)
  • Files: TRIS, USDOT, STATEDOT
  • Created Date: May 10 1994 12:00AM