KEMPSTON URBAN CYCLE ROUTE PROJECT AFTER STUDY
The Kempston (Bedford) Urban Cycle Route is one of the large scale cycle projects supported by the Department of Transport (DOT) cycle route research programme. The spine of the network runs for 5 km on a SW - NE axis from the Kempston boundary to Bedford town centre. Subsidiary links provide almost complete coverage of Kempston. The report compares survey and cycle count data taken in 1985 before construction started with similar data for 1990 when the route was mostly completed.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/09684107
-
Corporate Authors:
TRL
Crowthorne House, Nine Mile Ride
Wokingham, Berkshire United Kingdom RG40 3GA -
Authors:
- HARBIDGE, J F
- HENLEY, S
- JONES, R H
- Publication Date: 1993
Language
- English
Media Info
- Features: References;
- Pagination: 55 p.
-
Serial:
- TRL Contractor Report
- Issue Number: CR 337
- Publisher: Transport and Road Research Laboratory (TRRL)
- ISSN: 0968-4107
Subject/Index Terms
- TRT Terms: Attitudes; Before and after studies; Bikeways; Cyclists; Interviewing; Networks; Residential areas; Safety; Traffic flow; Traffic surveys; Travel time; Trip length; Urban areas
- Uncontrolled Terms: Transportation networks
- Geographic Terms: United Kingdom
- ITRD Terms: 2267: Attitude (psychol); 9148: Before and after study; 2722: Cycle track; 1742: Cyclist; 9147: Interview; 697: Journey time; 1054: Network (traffic); 307: Residential area; 1665: Safety; 671: Traffic flow; 676: Traffic survey; 8119: United Kingdom; 313: Urban area
- Subject Areas: Pedestrians and Bicyclists; Safety and Human Factors; Terminals and Facilities;
Filing Info
- Accession Number: 00638566
- Record Type: Publication
- Source Agency: Transport Research Laboratory
- Files: ITRD, ATRI
- Created Date: Nov 24 1993 12:00AM