ILLINOIS SAVES $1.5 MILLION WITH BRIDGE OVERCOAT
In an effort to put an end to corrosion problems on a 2,292-ft. bridge crossing the Illinois River at Peru, Illinois, the Illinois Department of Transportation has used a calcium sulfonate/alkyd (CSA) surface-tolerant maintenance coating to end aggravated corrosion conditions on the bridge. Because the CSA system was specified to overcoat the adherent old lead paint system, only loose paint and rust would need to be removed. The hand-tool cleaning operation was estimated to save nearly $1.5 million versus the cost of blast cleaning with full containment.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/1519687
-
Corporate Authors:
N/A
P.O. Box 558
Park Ridge, IL United States 60068 - Publication Date: 1993-7
Language
- English
Media Info
- Pagination: p. 35
-
Serial:
- Better Roads
- Volume: 63
- Issue Number: 7
- Publisher: James Informational Media, Incorporated
- ISSN: 0006-0208
- Serial URL: http://www.betterroads.com
Subject/Index Terms
- TRT Terms: Bridges; Coatings; Corrosion protection; Cost control; Maintenance; Metal bridges; Steel bridges
- Uncontrolled Terms: Bridge maintenance; Cost savings
- Geographic Terms: Illinois
- Subject Areas: Bridges and other structures; Highways; Maintenance and Preservation; I61: Equipment and Maintenance Methods;
Filing Info
- Accession Number: 00636586
- Record Type: Publication
- Files: TRIS
- Created Date: Sep 27 1993 12:00AM