NS SAVANNAH ANNUAL 1966 OUTAGE COST REPORT

This report covers the costs incurred by the N. S. Savannah while in the shipyard during 1966. Cost breakdowns are provided for maintenance and repair, improvements, health physics support, ship stores and supplies, and total cost. Each of these subdivided into conventional, nuclear, and total outage costs. An appendix is included that lists each job performed, the cost at the Galveston Division, cost at the Nuclear Division, the subcontracted work, and then a total cost.

  • Corporate Authors:

    Todd Shipyards Corporation

    Nuclear Division, PO Box 1600
    Galveston, TX  United States  77550
  • Publication Date: 1966