CONTEMPORARY CONSTRUCTION AND DETAILING TECHNIQUES FOR SEGMENTAL CONCRETE PAVING

The successful construction of a segmental concrete pavement includes two principal factors: suitable engineering design and specifications following adequate investigation of site and vehicular loading conditions; adequate construction and detailing procedures. The first of these factors is controlled by technical engineering. In the case of segmental concrete paving, the factor of construction detailing is influenced by aesthetics and site procedures. This paper sets out contemporary techniques in the detailing and construction of segmental concrete pavements which have proven to be successful in meeting the above requirements in paving applications. Diagrams and illustrations are set out demonstrating practical and aesthetic detailing aspects at features such as pits, manholes, pavement edges and connections to other pavements. (A) For the covering entry of this conference, see IRRD abstract no. 843369.

Language

  • English

Media Info

  • Features: References;
  • Pagination: p. 281-91

Subject/Index Terms

Filing Info

  • Accession Number: 00632357
  • Record Type: Publication
  • Source Agency: ARRB
  • Files: ITRD, ATRI
  • Created Date: Jul 1 1993 12:00AM