HIGH TECH AT KLIPPEN

This paper describes the sophisticated tunnelling methods used in the Klippen Kraftstation project in northern Sweden. At first sight, the project appears to be a standard small hydro scheme, consisting of a single turbine hall, with a 7.3km pressure tunnel, a 3.7km outfall, and two surge shafts, all constructed in relatively competent schists, granites and gneisses. In reality, it probably has the most technologically advanced set of equipment ever assembled for a hardrock tunnel construction job. Its machine hall and access tunnels are being driven by a Tamrock Maxi 306T Superdrilling jumbo. Its shafts are being drilled using a Robbins 81R raise borer. Its pressure and outfall tunnels are being bored by the new Atlas Copco Jarva Mark 27 tunnel boring machine (TBM) in the first commercial application of watercooled cutter technology. The TBM muck is being removed by Kraftbyggarna's revolutionary rapid haulage system. The achievement is specially remarkable, because of the inaccessibility and cold climate of the site. The TBM tunnel was scheduled to pass the completed machine hall in June 1992, and to reach the tapping point by Autumn 1993. The surge shafts need to be completed by early 1993, to allow the power plant to be commissioned in 1994.

  • Availability:
  • Corporate Authors:

    Mining Journal Limited

    60 Worship Street
    London EC2A 2HD,   England 
  • Authors:
    • Smith, M
  • Publication Date: 1992-2

Language

  • English

Media Info

  • Features: References;
  • Pagination: p. 5-7
  • Serial:
    • WORLD TUNNELLING
    • Volume: 5
    • Issue Number: 1
    • Publisher: THE MINING JOURNAL LTD
    • ISSN: 0956-8700

Subject/Index Terms

Filing Info

  • Accession Number: 00630398
  • Record Type: Publication
  • Source Agency: Transport Research Laboratory
  • Files: ITRD
  • Created Date: Jun 21 1993 12:00AM