THE CONSTRUCTION OF TUNNELS FOR THE NEW LINES TO BE BUILT BY THE DB
DER TUNNELBAN IM ZUGE DER NEUBAUSTRECKEN DER DEUTSCHEN BUNDESBAHN
The difficult problem of the layout of tunnels to be constructed, for new DB lines, is dealt with from the engineer consultant standpoint. The author highlights the details of mechanised boring and considers all its aspects, account being taken of the dimensions of the transversal section, the equipment used and protection procedures. In conclusion, he proposes tunnel borings for single and double line traffic working for speeds in the region of 300 km/h.
-
Corporate Authors:
Hestra Verlag
Holzhofallee 33, Postfach 4244
6100 Darmstadt 1, Germany -
Authors:
- BERGER, H
- Publication Date: 1975-1
Language
- German
Media Info
- Features: Figures; References;
- Pagination: p. 21-25
-
Serial:
- Eisenbahntechnische Rundschau
- Publisher: Hestra Verlag
Subject/Index Terms
- TRT Terms: High speed track; Improvements; Lines of track; Structural design; Tunneling machines; Tunnels
- Identifier Terms: Deutsche Bahn; Deutsche Bundesbahn
- Uncontrolled Terms: Tunnel design
- Subject Areas: Bridges and other structures; Railroads;
Filing Info
- Accession Number: 00126995
- Record Type: Publication
- Source Agency: International Railway Documentation, Selection of
- Files: TRIS
- Created Date: Nov 18 1975 12:00AM