CONTROLLING TRACK SETTLEMENT AS AN INTEGRATED OPERATION OF THE LINING AND TAMPING-CYCLE
Despite consolidation of track, an immediate gradual settlement takes place once the line is opened to traffic. To minimize this, Plasser & Theurer's dynamic stabilizing group can make a substantial contribution when operated in conjunction with the lining and tamping machine to which it is coupled.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/9675046
-
Corporate Authors:
Broadfields (Technical Publishers) Limited
Little Leighs
Chelmsford, Essex CMB 1PM, England - Publication Date: 1975-6
Media Info
- Features: Figures; Photos;
- Pagination: p. 165-166
-
Serial:
- Rail Engineering International
- Volume: 5
- Issue Number: 4
- Publisher: De Rooi Publications
- ISSN: 0141-4615
Subject/Index Terms
- TRT Terms: Alignment; Compaction; Maintenance of way; Mechanical stability; Railroad tracks; Soil compaction
- Uncontrolled Terms: Track stability
- Old TRIS Terms: Track alignment; Track maintenance equipment
- Subject Areas: Geotechnology; Railroads;
Filing Info
- Accession Number: 00126450
- Record Type: Publication
- Files: TRIS
- Created Date: Nov 5 1976 12:00AM