GEOTECHNICS AND MECHANIZED TUNNEL BORING--THE ECHAILLON EXPERIENCE
LA GEOTECHNIQUE ET LE CREUSEMENT MECANISE DES TUNNELS-EXPERIENCE D'ECHAILLON
Report on the experience gained with the boring of a road tunnel in the Alpine crystalline range at Echaillon (Dauphine Alps). The 4.7 km tunnel (diameter: 5.8 m) was bored with a WIRTH machine in 4150 hours of work. This operation was monitored by the Technical Division of the French Electricity Board and the Toulouse Mineralogical Laboratory.
-
Corporate Authors:
Societe de Diffusion de Tech du Bat et de Trav Pub
9 rue la Perouse
Paris 16e, France -
Authors:
- Cordel, R
- Publication Date: 1974-11
Language
- French
Media Info
- Features: Figures; References; Tables;
- Pagination: p. 73-87
-
Serial:
- Annales de l'Institut Tech du Batiment Travaux Pub
- Issue Number: 322
- Publisher: Societe de Diffusion de Tech du Bat et de Trav Pub
Subject/Index Terms
Filing Info
- Accession Number: 00099768
- Record Type: Publication
- Source Agency: International Railway Documentation, Selection of
- Files: TRIS
- Created Date: Oct 18 1975 12:00AM