REPAIRING A MAJOR CONCRETE NAVIGATION LOCK
SUCCESSFUL EPOXY INJECTION REPAIRS OF THE JOHN DAY DAM AND NAVIGATION LOCK ON THE COLUMBIA RIVER BETWEEN WASHINGTON STATE AND OREGON
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/4163061
-
Supplemental Notes:
- BY PETER BARLOW ILLUSTRATED
-
Authors:
- Barlow, P
- Publication Date: 1986-4
Language
- English
Media Info
- Pagination: p. 50-52
-
Serial:
- Concrete International
- Volume: 8
- Issue Number: 4
- Publisher: American Concrete Institute (ACI)
- ISSN: 0162-4075
Subject/Index Terms
- TRT Terms: Epoxy resins; Locks (Waterways); Maintenance
- Geographic Terms: Columbia River
- Subject Areas: Maintenance and Preservation; Marine Transportation;
Filing Info
- Accession Number: 00559107
- Record Type: Publication
- Source Agency: UC Berkeley Transportation Library
- Files: TLIB
- Created Date: Apr 30 1990 12:00AM