CONTRIBUTION TO THE SOLUTION FOR PLACING WAGONS AND GROUPS OF WAGONS IN THE SORTING SIDINGS OF MARSHALLING YARD INSTALLATIONS
EIN BEITRAG ZUM PROBLEM DER WEITERFOERDERUNG VON EINZELWAGEN UND WAGENGRUPPEN IN RICHTUNGGLEISEN AUTOMATISIERTER RANGIERBAHNHOEE
The system studied is as follows: the sorting siding after the rail brake is divided into 2 sections: a wagon spacing section on which 2 handling trucks alternately ensure the positioning of the wagons; a pre-support section on which the wagons come to a halt in random fashion. When a certain number has been reached, a second handling truck moves them intermittently to their final contact position. The study calculates the length of these sections, and the movement speeds to be observed to bring the wagons into contact without excessive impacts.
-
Corporate Authors:
Sci Comm for Way & Works & Operat Tech, 5th Sess
Frankfort am Main, Germany -
Authors:
- Goebertshahn, R
- Publication Date: 1974
Language
- German
Media Info
- Features: Figures;
- Pagination: 18 p.
Subject/Index Terms
- TRT Terms: Hump yards; Layout; Railroad traffic control; Railroad yards; Vehicle push devices; Yard operations
- Identifier Terms: Deutsche Bahn; Deutsche Bundesbahn
- Old TRIS Terms: Car pushers; Hump control computers; Yard layout planning
- Subject Areas: Freight Transportation; Operations and Traffic Management; Railroads; Terminals and Facilities; Vehicles and Equipment;
Filing Info
- Accession Number: 00129785
- Record Type: Publication
- Source Agency: International Union of Railways
- Files: TRIS
- Created Date: Mar 10 1976 12:00AM