SECTION A009: ROCKVILLE ROUTE, YUMA STREET ALTERNATIVES, SUBSURFACE INVESTIGATION
The report summarizes results of eight borings made in connection with a study of a series of possible alternatives for the Yuma Street link in Section A009 of Rockville Route connecting the subway on Connecticut Avenue with the continuation of the subway on Wisconsin Avenue within Northwest Washington, D.C., of the Washington Metropolitan Area Metro system. The investigation was made to generally assess subsurface conditions at the locations of subway structures in connection with an environmental impact statement. The report contains a series of geological sections illustrating four alternative positions for this connecting link, logs of the eight borings and a general discussion of anticipated subsurface conditions.
-
Supplemental Notes:
- Sponsored in part by Washington Metropolitan Area Transit Authority, D.C.
-
Corporate Authors:
Mueser, Rutlege, Wentworth and Johnston
415 Madison Avenue
New York, NY United States 10314Washington Metropolitan Area Transit Authority
600 Fifth Street, NW
Washington, DC United States 20001De Leuw, Cather and Company
L'Enfant Plaza North Building
Washington, DC United States - Publication Date: 1975-11-26
Media Info
- Pagination: 52 p.
Subject/Index Terms
- TRT Terms: Boring; Construction; Environmental impact statements; Excavation and tunneling; Foundations; Geological surveying; Geology; Rock mechanics; Routes; Subways; Testing; Underground structures
- Geographic Terms: Washington (District of Columbia)
- Old TRIS Terms: Subsurface explorations; Subway construction; Subway railways
- Subject Areas: Bridges and other structures; Construction; Geotechnology; Highways; Public Transportation;
Filing Info
- Accession Number: 00094698
- Record Type: Publication
- Source Agency: National Technical Information Service
- Report/Paper Numbers: MRWJ-75-139 Intrm Rpt.
- Files: TRIS
- Created Date: May 14 1981 12:00AM